| |
| Bathroom |
Project
Summary:
- Economy bathroom remodel
- Recycled tub, toilet, shower door & glass
- Off-the-shelf vanities and vanity top
- New fiberglass shower base
- New fixtures
- Tile flooring
- Off-the-shelf Tiles used for flooring, tile, tub surround
- Light drywall repair & paint
Prob: This homeowner's shower door had a leak plus an
improperly installed shower fixture further caused the
floor to be soft in front of the shower door under the
old vinyl flooring. Homeowner decided to fix the problem
and upgrade the bathroom to update this 90's bathroom.
*Cost estimate: $45 - $55 per sq ft
Complete tear-out to finish timeframe: 3-4 weeks
(after design has been completed)
*Cost estimate based on off-the-shelf materials, recycled
tub, shower door, and spacious room to work. Without recycled
materials, cost would go up to $65 - $75 per sq ft
*
We are a proud member of US Green Council Charlotte Regional
Chapter!
|
Tip:
Plan ahead. A typical special order vanity cabinet will
take 3-5 weeks for delivery.
Whenever possible, keep to ordering special items through
a reputable local vendor who will work with you to get
the order corrected in timely manner should there be problems
with the special order.
Special orders from online vendors or clearanced merchandise
items can delay work schedule.
Q: What can I expect?
A: See our step-by-step process
Contact us for a free quote!
|
|
|
Click here to see bathroom1 project (high-end remodel)
Click
here to see bathroom2 project (middle-upper remodel)
|